Synthetic Cricket Pitch Maintenance

Is it possible to breathe life into an old, neglected cricket wicket?

To successfully standardise the playing surface and offer a wicket which they can use in all circumstances, countless leisure centres, training centres and cricket clubs use artificial wickets. Even though artificial pitches will be more hard-wearing than purely natural pitches, in addition they need frequent routine maintenance to ensure they are in pristine condition. Thankfully, even ancient, mistreated cricket wickets can be brought back to life with a little TLC and the most suitable treatment plan. You will find 1,000’s of sites with important information with regards to ‘cricket wicket maintenance’ this could be one of the better ones www.artificialgrassmaintenance.co.uk/cricket-pitch-wicket-maintenance-installation

Artificial Wickets

Synthetic cricket wickets may be installed on either a dynamic (stone) or non-dynamic (macadam or concrete) base. The top of the wicket itself is manufactured from excellent quality short pile carpet that is either hardwood edged and nailed or nailed directly into the aggregate. Shock pads can also be placed underneath the surface of the pitch to guarantee the ball bounces nicely and also that the synthetic wicket responds much the same way to the cricket ball each time, what ever the weather.

Maintaining A Synthetic Pitch

Like all artificial surfaces, synthetic cricket, cricket wickets should be correctly maintained if they’re to offer the most effective playing wicket throughout the year. We recommend that anyone using an artificial cricket wicket really should make use of a yearly deep clean regime, level the batting zone frequently and use at least one chemical treatment method every six months.

Despite having regular maintenance, cricket pitches may degrade over time, shock pads can harden and surface areas can become uneven. If you see that the bounce of the cricket ball is starting to become uneven or that the surface area looks tired and worn, it may be the perfect time to give your synthetic pitch a renovation.